Our launch coverage on the NASA Blog and on NASA TV will begin at 4:30 p.m. The primary concerns are cumulus clouds, disturbed weather and thick clouds at launch time. The launch day forecast remains at 60 percent “go” for the liftoff of an Orbital ATK Cygnus spacecraft aboard an Atlas V rocket Thursday at 5:55 p.m. To read more about the new work platforms, visit. The first two sets of platforms, J and K, were delivered to Kennedy earlier this year. ![]() The Ground Systems Development and Operations Program at Kennedy is overseeing upgrades and modifications to the high bay to prepare for NASA’s exploration missions to deep-space destinations. A contract to modify High Bay 3 was awarded to Hensel Phelps Construction Co. The platforms are being fabricated by Steel LLC of Scottdale, Georgia, and assembled by Sauer. ![]() The high bay also will accommodate the 355-foot-tall mobile launcher tower that will carry the rocket and spacecraft atop the crawler-transporter to Launch Pad 39B. Twenty new elevator landings and access ways are being constructed for each platform level. There was very minor damage to the platform and no indication of structural damage.Ī total of 10 levels of new platforms, 20 platform halves altogether, will be used to access, test and process the SLS rocket and Orion spacecraft in High Bay 3. There was no personal injury and the City of Titusville is working the repairs. Hensel Phelps moved Platform H on an over-sized load, heavy transport trailer from the Sauer Company in Oak Hill, Florida, and was successfully delivered to the VAB west parking lot work area.Īs the platform was being transported through Titusville, the edge of the platform contacted a light pole near US1 and DeLeon Street. The H platforms are the third of 10 levels of platforms that will support processing of the Space Launch System (SLS) rocket and Orion spacecraft for the journey to Mars. ![]() The second half of the H level work platforms for the Vehicle Assembly Building arrived today at NASA’s Kennedy Space Center in Florida. The second half of the H level work platforms for the Vehicle Assembly Building arrives at NASA’s Kennedy Space Center in Florida.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |